Anyone who knows VCA or ISO expects a folder full of procedures for the Safety Culture Ladder. So which documents do you need to have ready? After reading this article you will know what has to be on paper, what your self-assessment, gap analysis and action plan must contain, which details the auditor checks and what is on your report and certificate.
What the SCL asks for on paper
The Safety Culture Ladder assesses behaviour. That is why your arrangements on safety and health do not have to be on paper. The standard text says that a management system is not mandatory. If a document helps your company, you may use it. The auditor looks mainly at what people do and say.
You do need a few documents. A gap analysis lists where you are still below the step you want to reach. An action plan says what you do about it. Which documents you need depends on your product:
| Document | SCL Light | SCL and SCL Original |
|---|---|---|
| self-assessment | mandatory, with the NEN questionnaire (SAQ) | mandatory, with an instrument of your choice |
| gap analysis and action plan | mandatory | not mandatory |
| behaviour goals | one to three, in the web tool | not mandatory |
| company details and management declaration | mandatory | mandatory |
Do you already have VCA or ISO 45001? Then you may also use the arrangements you made for those for the SCL. You do not have to write anything new for it. Your step depends mainly on the behaviour the auditor sees anyway. What VCA does ask for on paper is explained in the documents for VCA.
Self-assessment for the SCL
Every SCL audit starts with a self-assessment of your company. With SCL Light you must use the NEN Self Assessment Questionnaire (SAQ). It is in the NEN web tool. The web tool comes with an online file. You put your documents in it, and you give the certification body access. With SCL and SCL Original you may also use another instrument. You then supply the outcome to the certification body yourself.
The self-assessment is your baseline measurement. It shows where you are already at step 3 and where not yet. In the preparation of the audit the lead auditor first checks that it is there. That is the first step of the preparation.
Gap analysis and action plan with SCL Light
With SCL Light you compare the outcome of your self-assessment with the step you want to reach. That is called a gap analysis. You make it in the first year of each three-year cycle, so in year 1 and again in year 4. The gap analysis contains at least these five points:
- Period. When you completed the questionnaire.
- Outcomes. What the self-assessment showed.
- Gaps. Which points are below the desired level.
- Analysis. How your current situation relates to the desired one.
- Measures. What you will do to close the gap.
The action plan works out each measure into a step-by-step plan. It contains the actions and the result you want to achieve. It also states when each action will be finished and who carries it out, with name and position. You describe how you check that the actions are progressing and how you adjust course. In later years you also include the actions and results of the previous years.
The certification body checks that the documents contain these points. It checks whether the measures are specific and measurable and fit the gaps. Whether they will also work is not assessed by the certification body. That becomes clear in the audits after that. How much time these documents take you, NEN does not say.
Behaviour goals with SCL Light
With SCL Light you set one to three goals for a change in behaviour. You do that in the web tool, together with a self-declaration. In it you also declare that management is involved in those goals. Since 1 July 2025 the goals have been part of the action plan. Since 1 July 2026 they also count in the auditor's judgement.
In the years after the first audit the auditor checks whether you have achieved the goals and set new ones. The auditor also checks whether management is visibly involved and whether the change can be seen on the shop floor. If a subtheme scores orange in the audit, you set a separate goal for that subtheme.
With SCL Light you do not have to put the self-declaration in the public NEN register. Only the statement your certification body issues goes into the register.
Company details for the SCL audit
In the preparation the lead auditor checks your company details. Keep these documents ready:
- Chamber of Commerce (KvK) extract. With the correct name of each company covered by the certificate.
- Structure. Your operating companies and branch locations.
- Employees. Your own people and your hired people. For hired people the average over a year counts.
- Projects. How many projects you have running at the same time on average.
The auditor may also ask for additional documents to plan the audit properly. As examples, the scheme names your safety or culture programme, the outcome of your internal audit and your management review, your management's regular look back at how things are going. If you are audited at step 4 or 5, you also give an overview of your ongoing projects in the audit week. From it the auditor chooses the project for the unannounced visit.
For the decision on your certificate the certification body needs a declaration from your management. It states the activities and the companies covered by the certificate. If possible, you add the legal structure from your accountant's annual statement.
Audit report and certificate with the SCL
The audit report is confidential. It does not count as proof towards others. You receive it no later than fifteen working days after the last audit day. NEN does not receive the report, but may inspect it as a sample check or in the event of a complaint.
The report names the people the auditor spoke to. It does not link any statement to a name.
Your proof is the certificate or statement. It shows at least:
- Company. The legal name, the address and the Chamber of Commerce (KvK) number of each company it covers.
- Step. The step reached, or the step as an indication with a statement.
- Scope. The work covered by the certificate.
- Version. A reference to SCL 2.0 with the date of that version.
- Dates and number. The date of first issue, the date of the last change and a unique number.
For a holding with several locations you get one certificate. The locations are then listed in an annex. The certification body registers the certificate with NEN, and NEN puts it in the public register. That is where your client looks it up.
The list of documents is the same for every certification body. Which additional documents the auditor asks for the planning can differ. Ask about that in every quote. At CertificeerWijzer you request quotes from certification bodies with an SCL licence in one request, and you enter your product, your step and your number of employees once.
Sources
- NEN, Safety Culture Ladder 2.0 (standard text), September 2023 safetycultureladder.com
- NEN, Certificatieschema Safety Culture Ladder 2.0 (certification scheme), September 2023 safetycultureladder.com
- NEN, Committee of Experts decisions 2025-06 and 2025-07 (SCL Light) and 2025-09 (transition of SA and SCL Light) safetycultureladder.com
- NEN, The route to step 3 for small businesses, 24 February 2026 safetycultureladder.com
- NEN, Veiligheidsladder (Safety Culture Ladder) nen.nl
- GCVB, Handreiking Veiligheid in Aanbestedingen 2026 (guidance on safety in tenders), version 3.1, June 2026 gc-veiligheid.nl
- GCVB, Veiligheid in Aanbesteding (ViA) gc-veiligheid.nl
- KVK, What is on an extract from the Business Register? kvk.nl